Domestic performance
Gwangju KIA
UN JIG installation
UN SIDE ASS`Y bogie installation
Demolition and installation of SL body equipment
Demolition and installation of AM equipment
NCA installation work
WA renovation and installation work
LD BC mounting line demolition and installation work
Dangjin HUNDAI ROTEM
BHMC 5 factory T/F PRESS disassembly support
Bupyeong GM
AD-100 LINE AVIA installation work
V-200 ROOF ASS`Y LINE demolition work
T-200 HEMMING PRESS installation work
MB 020 MAIN BUCK installation work
T-250 LINE installation work
V-250 LINE installation work
C-100 LINE installation work
Ansan Yulchon Chemical
UN-BIND equipment installation and DECK installation
BUDGET HUNDAI ROTEM
HUNDAI-STEEL BUDGET 2 FACTORY 1200TON HOT STAMPING PRESS
PUNCH operation
Jeonju HUNDAI
PRESS precision inspection and improvement work
BUS TENSIONER demolition and installation work
Panel press forming pressure sensing system installation
Chungju W-SCOPE
CP02,03,04,05 MAIN LINE installation work
Seosan HUNDAI ROTEM
Hyundai Partex 5400TON PRESS Installation Construction and Test Run
Gwangmyeong KIA
JB project body line installation work
BQ line installation work
KMC Sohari Plant 4 Line Press Demolition
Gwangmyeong Seojin Industry
Gwangju factory relocation
3 line 5400TON cushion A/S construction
BUDGET HUNDAI ROTEM
Sohari Kia Robot Beam Check
Sohari Kia 2000TON Press Stair Vibration Improvement Construction
Sohari Kia Press 3 lines 5 lines
Pyeongtaek Saehan IndustryLine relocation work
Pyeongtaek Beomdong ConstructionThermal power plant 250TON generator installation work
Pyeongtaek Yulchon ChemicalMechanical equipment SOL&ANCHOR PLATE installation work
Asan HUNDAI
TG project body line relocation and installation work
Relocation and installation of GH/YF equipment
Asan IG existing product removal and new installation work
Changwon GM
Kookmin Motor Corporation
M150 RR DOOR LINE & TEST CELL relocation work
Changwon Auto TechGM DAT T200/250 FRT/RR DR LINE relocation work
Changwon Samho Jeonggi
Daewoo Machinery Installation Construction
Ssangyong Engine Factory Remodeling and Relocation Work
Changwon Samsung ElectronicsChangwon plant relocation construction
Changwon Wooshin SystemT-CAR R-DOOR relocation work
Changwon Daesang ENG
GM DAT T-300 U/BODY LINE dismantling, transportation and installation work
Hwaseong KIA
Sportage LINE renovation and new construction
L/D MAIN BUCK /NCA installation work
A-100 DR INR construction
Hwaseong KIA
M/G installation other than Optima LINE, STORAGE installation construction
TD SIDE UP&DOWN equipment installation work
2300TON T/O Press Accuracy Adjustment
RIAL ARM BALANCE production and installation construction
H PRESS 11 LINE Cushion Device Supplement
Disteca rack gear production
Mold factory MB LIFT cylinder rod replacement work
2100TON T/O PRESS installation work
2300TON T/O PRESS LEFT M/B installation work
HEMMING PRESS INSTALLATION ASSEMBLY DISASSEMBLY
Ulsan HUNDAI
5 Factory bodywork installation
M-200 installation work
SIDE OTR equipment installation
1 Install Factory FLR COMPL SHTL Replacement M/BUCK Driver
TQ equipment installation work
2 Factory 16 Supplemental Investment Equipment Installation Construction
1 Factory press baler overhaul work
4 Factory Press Die Clamp Hydraulic Line Piping Improvement Work
2 Factory body flexible relocation work FLR SIDE LINE Bon
Ulsan HUNDAI
4 Factory press B LINE balance cylinder packing replacement/brake repair
3 Factory Press A2 LINE Slide Gib Gap Adjustment Work
2 Factory Press Blanking Unit 2 Uncoiler Repair
3 Factory 3500TON 2 LINE Accuracy check
1 Factory Rationalization OH/MAIN LINE
3 Factory Cushion Cooling Unit Renovation
1 Factory A3 Remodeling
3 Factory Cushion Chiller Plumbing
2 Factory rationalization and demolition work
Preparing
Preparing
Overseas performance
멕시코
HUNDAI WIA
KMM 무빙, B/C LINE, 로봇 설치 공사
코스마 SLF 프레스 라인 설치 공사
KMM BDm 설치 및 시운전 공사
멕시코법인 CVJ 증설 2단계 설비 설치 공사
HUNDAI ROTEM
KMM 5400TON T/F PRESS 1/2 LINE 설치 및 시운전 보조
KMM 차체 EMS 운반설비 설치 공사
KMM 의장 운반설비 설치 보완 공사
KMM PRESS LINE 설비 점검
KIA
KMM 차체설비 설치 공사
SC 차종 5DR 설비 설치 공사
SC 4DR 장비 신작 설치 공사
한국브로치
MMX 브로치 설치 공사
신영
ALLGAIER MFA2 JIG 설치 공사
러시아
HUNDAI
D/L 구동부 이원화 시설 작업
차체 GSR(JIG/ROBOT) 현지 설치
FB 차종 차체설비 설치 공사
신영
GSR 차종 (JIG/ROBOT) 설비 설치 공사
Hcr+FB 차종 (JIG/ROBOT) 설비 설치 공사
러시아 FB 5DR 현지 설치 공사
러시아 Fsr 설비 이설 공사
HUNDAI HEAVY INDUSTRIES
NISSAN 러시아 UAG 의장 컨베어 설비 설치 공사
NISSAN 러시아 UAG 2400TON 탠덤프레스 라인 설치 공사
HUNDAI ROTEM
HMMR P/J 차종 용접건 설치 공사
HMMR 5100TON 탠덤프레스 라인 개선 공사
HMMR 프레스 라인 정기 점검
HMMR 2300TON T/O프레스 정기 점검